Grand Cape Mount Project
Current Operations
Excavation
NHM controls 15 blocks (Lb01 through Lb15). NHM has cleared down to the gravel layer in sections of Block Lb03 and Block Lb04.
NHM has provided operators, maintenance and fuel for all heavy equipment. We will continue to excavate the mining site using Bulldozers and Excavators.
Wash Plant
NHM has secured Wash Plants for Blocks Lb03 and Lb04 and will begin processing gravel pending funding. NHM will secure additional Wash Plants pending funding.
The wash plant is designed to wash the gravel, remove clay and separate out large rocks. Wash Plants are specified to extract > 95% of Gold concentrate from gravel.
Security
NHM is providing security onsite. NHM has security patrolling sites. With visible security, they have not had any issues with theft of equipment.
Employment in Liberia
NHM will have a Production staff of over 30 local Liberians working in 4Q15 and over 100 by 4Q16. When production begins, each wash plant will employ 8-10 workers. NHM is feeding workers and providing Project Management.